[1]
Roni Febrianto, Sami’an and Sarwono Hardjomuljadi 2025. The Cost Claims due to Extension of Time on Construction Contracts (Case Study: Power Plant Project). International Journal of Law, Policy, and Governance. 4, 1 (Feb. 2025). DOI:https://doi.org/10.54099/ijlpg.v4i1.1230.