Roni Febrianto, Sami’an, & Sarwono Hardjomuljadi. (2025). The Cost Claims due to Extension of Time on Construction Contracts (Case Study: Power Plant Project). International Journal of Law, Policy, and Governance, 4(1). https://doi.org/10.54099/ijlpg.v4i1.1230