Claim for Costs Due to Rerouting of SUTT 150 kV New Garuda Sakti – Perawang
DOI:
https://doi.org/10.54099/ijlpg.v4i1.1222Keywords:
Electricity transmission projects,, cost claims,, legal perspective, constructionAbstract
Purpose –This study aims to analyze the impact of design changes from lattice tower to steelpole on the 150 kV New Garuda Sakti - Perawang electricity transmission project, with a focus on legal and financial implications, including cost claims, material efficiency, and land acquisition. Methodology/approach –This study uses a qualitative approach with analysis of contract documents, applicable legal regulations, and technical data related to the project. Additional data were obtained through a literature review of relevant regulations, such as Presidential Regulation No. 16 of 2018 and Law No. 2 of 2017, as well as the international standard FIDIC Conditions of Contract. Findings –The design change from lattice tower to steelpole provides material efficiency because it utilizes waste material without new procurement. The use of land owned by the road eliminates the need for land acquisition, but there are additional costs arising from the adjustment of installation and labor. From a legal perspective, claims for additional costs are acceptable if they are in accordance with the contract and supported by valid documentation.. Novelty/value –Given the importance of cost claims management and legal compliance in infrastructure projects, this research provides important insights for construction industry players in managing design changes and legal challenges.
References
Anwar, A. S. (2020). Legal aspects of construction contracts in Indonesia: Challenges and opportunities. Journal of Indonesian Construction Law.
Bower, G. L., & Leland, S. H. (2018). Construction law: Cases and materials. Wiley.
FIDIC (2017). Conditions of Contract for Construction (Red Book). International Federation of Consulting Engineers.
Hasibuan, R. (2021). Hukum kontrak dalam proyek konstruksi: Perspektif dan praktik di Indonesia. Jakarta: Rajawali Pers.
Imanto, Y., Sami’an, S., & Hardjomuljadi, S. (2025). The Legal and Regulatory Review on the Implementation of Green Construction in Indonesia. International Journal of Law, Policy, and Governance, 4(1), Article 1. https://doi.org/10.54099/ijlpg.v4i1.1241
Iskamto, D., & Juariyah, L. (2023). Blockchain Technology Challenge in the Future: : Data Security and Efficiency. International Journal of Law Policy and Governance, 2(2), Article 2. https://doi.org/10.54099/ijlpg.v2i2.708
Johnson, M. L., & Lee, H. K. (2020). Construction contracts and dispute resolution: Legal aspects of the construction industry. Springer.
Luo, Y., Zhou, Q., & Liu, W. (2020). "Cost Control in Transmission Line Projects: Case Study on Design Changes". Journal of Civil Engineering and Construction Management.
Mahardika, D., Suzan, L., & Mulia, T. W. (2024). Literasi Keuangan: Mewaspadai Investasi Illegal. Jurnal Pengabdian Masyarakat Akademisi, 3(4), Article 4. https://doi.org/10.54099/jpma.v3i4.1142
Markonah, M., Silalahi, S., & Selliamanik, I. (2023). Claim Paying and Reinsurance on Company’s Financial Health. International Journal of Applied Management and Business, 1(1), Article 1. https://doi.org/10.54099/ijamb.v1i1.459
Murray, M., & Hebert, D. (2019). Construction Contract Claims: A Comprehensive Guide. Wiley-Blackwell.
Presiden RI. (2018). Peraturan Presiden No. 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah.
PT PLN (Persero). Standar Operasional Prosedur Pengadaan Barang/Jasa 2023.
S, G. T. P., & Miasiratni, M. (2025). Legal Certainty In The Implementation Of Regional Regulations In West Sumatra Based On Minangkabau Customary Values. International Journal of Law, Policy, and Governance, 4(1), Article 1. https://doi.org/10.54099/ijlpg.v4i1.1163
Samian, D. (2023). Perspektif hukum dalam klaim biaya proyek konstruksi transmisi. Unpublished manuscript.
Sugijanto, M. (2022). The Art of Contract Drafting. Jakarta: PT Alex Media Komputindo.
Sungkara, F., Sami’an, S., & Hardjomuljadi, S. (2025). Legal Aspects of Extension of Time in PLN Transmission Construction Project in Central Sumatra: Bahasa Indonesia. International Journal of Law, Policy, and Governance, 4(1), Article 1. https://doi.org/10.54099/ijlpg.v4i1.1215
Suyono, H. (2019). "Resolusi Konflik dalam Kontrak Konstruksi: Perspektif Hukum dan Praktik". Jurnal Hukum Bisnis.
Tay, A. P. (2019). Contract law in construction: Issues and remedies. Wiley.
Undang-Undang Republik Indonesia No. 2 Tahun 2017 tentang Jasa Konstruksi
Zhang, S., Li, X., & Guo, X. (2019). "The Impact of Design Changes on Cost Control in Power Transmission Projects". Energy Engineering Review.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 International Journal of Law, Policy, and Governance

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.