Claim Audit by BPKP (Financial and Development Supervisory Agency) on Construction Contracts in BUMN
DOI:
https://doi.org/10.54099/ijlpg.v4i2.1236Keywords:
BPKP, claims audit, disputesAbstract
Construction service work is the most complex work compared to other industries. It is not surprising that in the implementation of construction service work, things arise that deviate from the initial planning, resulting in claims by the Provider of Goods/Services to the User of Goods/Services. In construction service work owned by BUMN (State-Owned Enterprises), several construction claims that have occurred that have been previously reviewed by the Provider of Goods/Services, are continued for the claim audit process by BPKP (Financial and Development Supervisory Agency), especially for claims related to additional costs that are quite large in value. Of course, this requires a mutual agreement between the User of Goods/Services and the Provider of Goods/Services to jointly submit a claim audit application to BPKP. This claim audit application to BPKP is carried out to ensure the amount of the claim submitted by the Provider of Goods/Services, where BPKP is seen as a competent and experienced body for claim audits. Problems will arise if: The Provider of Goods/Services does not agree to the claim audit process to BPKP because it is not stated in the construction contract or the Provider of Goods/Services does not agree with the results of the claim audit conducted by BPKP. In the event that the claim is not fulfilled or resolved, it means that a dispute has occurred between the contracting parties. This dispute must be resolved through the legal channels chosen by the parties in the contract, either through Alternative Dispute Resolution (Consultation, Negotiation, Mediation, Conciliation, Expert Assessment), Arbitration, or through the Court. The dispute resolution process will take longer, so it is necessary to rethink whether this claim audit to BPKP can be a faster way to resolve construction contract claims.
References
Empat.
Construction Contract Dispute Resolution Analysis.(2017). Bandung: Center for Education and Training of Water Resources and Construction, Ministry of Public Works and Public Housing.
Badjuri, A. (2012, November). Analysis of Factors Affecting the Quality of Public Sector Audit Results (Empirical Study at the Central Java BPKP Representative Office). Dynamics of Accounting, Finance and Banking, 1(2), 128.
Dr. Amir Hamzah, M. (2020). Library Research Methods Library Research Philosophical Study, Application, Process, and Research Results. Malang: CV Literasi Nusantara Abadi.
Dr. Sami'an, SM (2024). Construction Management and Construction Claims. Semarang: CV. Oxy Consultant.
Istiariani, I. (2018, March). The Influence of Independence, Professionalism and Competence on BPKP Auditor Performance (Case Study on BPKP Central Java Auditors). Islamadina, 19(1), 82. doi:https://dx.doi.org/10.30595/islamadina.v19i1.2473
Moch. Faisal Dwi Alfian, AU (2023, September). The Role of State Attorneys as Counterparts of BUMN (State-Owned Enterprises) in the Non-Litigation Field. Wijaya Putra Journal of Law, 1(2), 207-208. doi:https://doi.org/10.38156/jihwp.v1i2.132
Mulyadi, KP (1998). Auditing. Jakarta: Salemba Empat.
Nazir, M. (2003). Research Methods. Jakarta: Ghalia Indonesia.
Roger Flanagan, G.N. (1993). Risk Management And Construction. London: Blackwell Science, Ltd.
Seng Hansen, SM (2017). Construction Contract Management: A Practical Guide to Managing Construction Projects (Vol. New Edition). Jakarta: Gramedia Pustaka Utama.
Yan, P.H. (2011). Anatomy of Construction Disputes. City University of Hong Kong.
Yasin, IH (2004). Construction Claims & Construction Dispute Resolution. Jakarta: Gramedia Pustaka Utama.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Prasetyo Efendy, Sami’an Sami’an, Sarwono Hardjomuljadi

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.